Konica Minolta bizhub 500 Service Manual page 405

Hide thumbs Also See for bizhub 500:
Table of Contents

Advertisement

3. PERIODIC CHECK
[7]
[8]
72
[6]
[5]
[4]
[3]
[2]
[1]
50gaf2c156na
Field Service Ver1.0 Feb.2006
14.
Remove the bearing [1] and CL1 [2].
15.
Remove the E-ring [3] and then remove the loop
clutch (CL2) [4].
Note
• When installing CL2, be sure to set the stop-
per [5] to the screw [6].
16.
Remove the screw [7] and then remove the regis-
tration main body assy [8].

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bizhub 420

Table of Contents