Bosch rexroth Sytronix SvP 7030 IMC Operating Manual page 39

Variable-speed pump drive
Table of Contents

Advertisement

Motors
Table 22: Measures before commissioning motors that have been stored over a
prolonged period of time
Cables and connectors
Table 23: Measures before commissioning cables and connectors that have
been stored over a prolonged period of time
Internal gear or axial piston pumps
Table 24: Measures to be taken before commissioning pumps with long-term
storage
RE 62312-B, 03.2022
Storage time / months
> 1
> 12
> 60
·
·
·
·
·
·
·
·
·
·
·
Storage time / months
> 1
> 12
> 60
·
·
·
·
·
·
Storage time / months
> 1
> 12
> 60
·
·
·
·
·
·
·
Sytronix SvP 7030 IMC
Storing Sytronix systems
Measures for commissioning
Check all parts for freedom from damage.
Check all electrical contacts for corrosion.
Let the motor bearings run in without load for
one hour at 800 ... 1000 rpm. When the pump is
mounted, make sure that the pump does not run
dry.
Measure the insulation resistance. For values < 1
kOhm per volt rated voltage, the winding must
be dried.
Replace the bearing.
Replace the encoder.
Measures for commissioning
Check all parts for freedom from damage.
Check all electrical contacts for corrosion.
Visual inspection of the cable jacket. Do not
use the cable if you detect any abnormalities
(squeezed or kinked spots, discoloration, ...).
Measures for commissioning
Leave the internal pump as delivered (wetted
with mineral oil).
Fill the pump with mineral oil
Inspect the complete pump for damage and cor-
rosion before installing it.
Check the pump for proper function and leaks
during a test run.
Replace the shaft seal if a storage period of 24
months is exceeded.
As a precaution, we recommend that you have
the pump checked and the seals replaced by
a Rexroth service after the maximum storage
period has expired!