Bd Focalpoint™ Slide Profiler Installation Checklist; Bd Focalpoint™ Instrument Or Device; Workstation; Electronic Cables - BD FocalPoint GS User Manual

Table of Contents

Advertisement

20
BD FocalPoint™ Slide Profiler Installation Checklist
When the BD FocalPoint™ Slide Profiler is installed in your laboratory, ensure that all the
necessary components are present.
The BD FocalPoint™
20.1
BD FocalPoint™ Instrument or Device
Instrument
Slide trays
20.2

Workstation

Computer (CPU)
Monitor
Keyboard
Mouse and Mouse pad
Cart
Ethernet hub (optional)
Modem or Router
Printer
20.3

Electronic Cables

Ethernet
Printer to CPU
BD FocalPoint™ system to CPU
Monitor to CPU
Modem or Router to CPU
Keyboard to CPU
Power strip
Power cords:
Instrument
Printer
CPU
Monitor
Modem or Router
Ethernet hub (optional)
20.4

Additional Items Supplied at Startup

Printer paper (starter package)
Head cleaning tape (1)
One roll of slide barcode labels provided per site
Line protector and/or power supply (optional, at additional cost)
Switch Slides (as appropriate for laboratory)
system consists of the following components:
193

Advertisement

Table of Contents
loading

Table of Contents