Pre-Installation

Before installing a BD FocalPoint™ Slide Profiler, a BD-designated service representative
performs an inspection of your facility during which any necessary modifications to the facilities,
such as the installation of dedicated power and/or telephone lines, are identified. This
representative will also obtain a copy of your staining protocol and general information about
your cytology laboratory processes and procedures for analysis and reference. Figure 19-2
illustrates the activities that take place during the pre-installation phase.
182
Laboratory
Laboratory
Process
Information
Slide
System
Preparation
Installation
Compatibility
and
Assessment
Calibration
System
Operation
Automated
Process Integrity
Calibration and
Monitoring
System Integrity
Monitoring
Check power, phone lines, and other
physical requirements
Figure 19-2 – Pre-installation phase activities
BD Diagnostics
Facility
Pre-installation Phase
Inspection
Operator
Installation Phase
Training
Automated
Logging to the
System Log
Post-installation
Phase
Pre-Installation
Inspection of Facility
Modify Facility,
If Required