3
Preparing the System
Contents:
Topic
Preparing system hardware
Powering-on the system
Powering-on the system entails starting the ACQUITY UPLC I-Class IVD
system workstation, system modules, and MassLynx software. Each device or
instrument beeps three times and runs a series of startup tests. See
LEDs" on page 30
interpret indicator LED modes for device or instrument flow status and
whether the units are powered-on.
The column heater is automatically powered-on when you power-on the
Tip:
sample manager.
For mass spectrometer power-on instructions, refer to the Xevo TQ-S IVD
Mass Spectrometry System Operator's Overview and Maintenance Guide.
and
"Power LED" on page
Preparing system hardware
30, for information on how to
July 7, 2014, 715003736IVD Rev. C
Page
"Status
29