Binary Solvent Manager maintenance procedures: (Continued)
Maintenance
procedure
Replace the plunger
and seals
Replace the vent valve
cartridge
Clean the device's
exterior with a soft,
lint-free cloth, or paper
dampened with water
Spare parts
Warning:
accurate results, and is not damaged, use only Waters Quality Parts®.
Visit www.waters.com/wqp for information about Waters Quality Parts,
including how to order them
Listed below are parts you may want to keep on hand for repairs and
maintenance:
•
BSM PM kit
•
SM PM kit
•
ESI probe spares kit
•
Source spares kit
•
APH - IVD
•
Needle, 50 µL
Frequency
Replace as part of the annual scheduled routine
maintenance and, thereafter, as needed. The
typical failure modes are as follows:
• Late eluting peaks are exhibited and/or after a
dynamic leak test was performed where the leak
rate is above the acceptable limit.
• There is flow from the seal wash effluent during
the high pressure dynamic leak test.
• The solvent manager exhibits low or erratic flow
rate/ pressure pulsations.
Replace as part of your annual routine scheduled
maintenance and if the dynamic leak test fails
during the accumulator portion.
Perform as part of your annual routine scheduled
maintenance and when solvent or dust
accumulates.
To ensure that your system operates as designed, produces
July 7, 2014, 715003736IVD Rev. C
Spare parts
45
Need help?
Do you have a question about the ACQUITY UPLC I-Class IVD and is the answer not in the manual?