Installation - Aastra OpenCom 100 Mounting And Commissioning User Manual

Hide thumbs Also See for OpenCom 100:
Table of Contents

Advertisement

S
Connector Module
2M
5.1

Installation

Please note:
DANGER!
1. Pull out the mains plug of the OpenCom 130 / 150.
2. Open the housing cover of the OpenCom 130 / 150.
3. On the module board, remove the protective covers of the two S
and (B).
B
S
slots
2M
PCM
LAN 1
LAN 2
Position of the S
2M
4. Insert the S
module into the slots, making sure you insert the LED side of the
2M
module into the upper slot (B).
The module should only be installed by trained personnel.
The device contains hazardous voltages.
Activity LED
A
slots on the module board
Installation
slots (A)
2M
69

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OpenCom 100 and is the answer not in the manual?

Table of Contents