A.1 –Sign Off Procedure at System Reception
Prior to be shipped, the components of MATRIX CUBE System are submitted to a functional check at the
BTSR SpA factory.
Upon system reception, however, the Customer is kindly requested to carry out some preliminary OFF-LINE
checks to locate possible problems related for instance to transport, prior to carry out the actual installation.
This operation must be executed even and most of all in case the MATRIX CUBE System is not
immediately installed, but it remains stored for a given time before the installation.
Step
1
2
3
4

Sign Off Procedure at System Reception

Description
Check the integrity of packages.
Immediately notify possible damages
Remove the individual Creel items from the relevant
packages
Overlap the various items as shown on the figure
Connect the cables of DIAPER FEEDER Devices to
the electrical panel of the Creel.
If the actual system installation shall be postponed,
do not lead the cables inside the relevant cable
ducts.
MATRIX CUBE
Check
- 101

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MATRIX CUBE and is the answer not in the manual?

This manual is also suitable for:

Smart matrix cubeMatrix cube 2Matrix cube 3

Table of Contents