Norwood The Grain Handler 8 Operator's Manual page 77

Table of Contents

Advertisement

12. Assemble the Front Wheel Carrier Arm's 2 to the Front
Carrier Wheel Arm 1 , and secure using the 3/8-16 Hex
Bolts 3 , 3/8" Flat Washer 4 , and a 3/8"-16 Nylock Nuts
5 . Do not tighten the 3/8"-16 Nylock Nuts 5 at this
time.
(See Fig. # 3-91)
3
3
3
3
2
Fig. # 3-91 Assemble Carrier Wheel Arm To Carrier Wheel
Mount Plate
13. Next, support the sweep assembly with wood blocks to
get the dimension of 1.00"
1.00"
Fig. # 3-92 Set Distance From Outer Diameter of Sweep
Auger to Bin Floor
1
4
5
4
5
(See Fig. # 3-92)
3 - INSTALLATION
14. Now, lower the Front Wheel Carrier Arm's 1 to the floor
and tighten the 3/8"-16 Nylock Nuts 2 .
2
2
4
5
4
5
2
1
Fig. # 3-93 Lower the Front Wheel Carrier Arms to the Floor
15. If you have a concrete grain bin floor, then you will not
need to install the Parking Load Plates. If you have a
corrugated metal grain bin floor, then proceed to the next
step.
16. Center the Parking load plates 1 under the Front Wheel
Carrier Arm's, and secure with the 1/4"-14 X 1" Self Drill-
ing Hex Head Screws 2 .
2
2
Fig. # 3-94 Install Screws To Secure Parking Load Plates
3-37
and Tighten the Nuts
2
1
(See Fig. # 3-93)
2
2
1
2
2
1
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents