Norwood The Grain Handler 8 Operator's Manual page 49

Table of Contents

Advertisement

23. Install, the "Power Sweep Engagement Lever" 11 , and
all of the "Lever Hardware" 12 securing it.
3-22)
12
Fig. # 3-22 Install The "Power Sweep Engagement Lever"
24. Move the "Power Sweep Assembly" 27 inside the grain
bin. Set the "Power Sweep Gearbox" 28 end near the
"Center Hopper Sump" 29 .
27
29
Fig. # 3-23 Move the Power Sweep Assembly Gearbox End
Near The Center Hopper.
3 - INSTALLATION
(See Fig. #
12
11
12
12
12
(See Fig. # 3-23)
28
25. Remove the "Keeper Bolt & Nut" 30 from the "Power
Sweep Gearbox" 28 .
Fig. # 3-24 Remove the Keeper Bolt & Nut
26. Connect the "Splined U-Joint" 31 on the "Power Sweep
Gearbox" 28 to the "U-Trough Gearbox Splined Shaft"
32 at the center of the grain bin.
Fig. # 3-25 Connect the Splined U-Joint to the "U-Trough
Gearbox Splined Shaft
3-9
(See Fig. # 3-24)
30
28
31
28
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents