Norwood The Grain Handler 8 Operator's Manual page 65

Table of Contents

Advertisement

3. Install the "Upper Inclined Powerhead Stand" 66 with
the (Qty. 4) "3/8-16"X 2 Carriage Bolts 67 , & 3/8-16
Flange Nuts" 68 .
(See Fig. # 3-61)
66
Fig. # 3-61 Inclined Powerhead Stand Installation
4. The Powerhead Stand can be mounted in "5" different
positions for additional vertical support distances.
Fig. # 3-62)
Fig. # 3-62 Powerhead Stand (Shown In Position 2)
3 - INSTALLATION
5. Install the "Lower Inclined Powerhead Stand" 69 onto
67
68
6. If you purchased the "Wheel & Tire Assy Kit", installation
(See
Position 1
Position 2
Position 3
Position 4
Position 5
3-25
the "Upper Inclined Powerhead Stand" 66 . When
the desired support height is achieved, secure with the
"Locking Handle" 70 .
(See Fig. # 3-63)
70
Fig. # 3-63 Inclined Powerhead Stand Installation
is shown in the next figure. The "Wheel & Tire Assy Kit"
is used for moving the Inclined powerhead to an inside
storage area.
(See Fig. # 3-64)
Fig. # 3-64 Wheel & Tire Assy Kit Installation
66
69
Hairpin
3/4" Flat
Wheel
Washer
3/4" Flat
Washer

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents