Norwood The Grain Handler 8 Operator's Manual page 43

Table of Contents

Advertisement

2. Remove the "U-Trough Tube Rodent Cover" 1 from
the "U-Trough" 2 save the (Qty. 4) "1/2-13 X 1 Bolts"
3 , & "1/2-13 Nuts" 4 for later.
2
3
1
Fig. # 3-2 Remove U-Trough Rodent Cover
3. Locate the center of the U-Trough Grain Bin cutout using
the dimensions in the figure below.
1
R
2 "
1
14
8 "
5
7
8 "
5"
1
R6
2 "
U-Trough
End View
3 - INSTALLATION
(See Fig. # 3-2)
4
(See Fig. # 3-4)
1
6
2 "
Note: Before cutting
hole, check floor
height
Fig. # 3-4 U-Trough Tube Cutout and Locating Dimensions
4. Using the "U-Trough Tube Rodent Cover" 1 as a
template, trace a pattern onto the outside of the "Grain
Bin Wall" 5 . Use a "6" Torpedo Level" 6 to level
the cover.
(See Fig. # 3-3)
Fig. # 3-3 Trace a Pattern Onto the Outside of the Grain Bin
13"
Note: The Grain Bin
Cutout Is The Same
for 8" & 10" U-Trough's
3-3
Wall
Top Of
Aeration
5
2
8 "
Floor
U-Trough
Tube Rodent
Cover Plus
This Dimension
Outside Of
Grain Bin
Wall
U-Trough Tube
Rodent Cover
Outline
Grain Bin
Concrete
Base

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents