Norwood The Grain Handler 8 Operator's Manual page 48

Table of Contents

Advertisement

18. Install the Drying / Aeration floor to the manufacturer's
specifications.
19. Seal the areas in the "Grain Bin Floor" 24 that was cut
to fit around the hoppers with the "Hopper Flanges" 22 .
Use "Self-Drilling Screws" 23 to attach the flanges to
the "Grain Bin Floor" 24 .
24
23
22
Fig. # 3-18 Install Hopper Flanges
20. Caulk any cracks or openings with a good quality silicone
or butyl based sealant.
Fig. # 3-19 Caulk Around Hopper Flanges
3 - INSTALLATION
(See Fig. # 3-18)
22
(See Fig. # 3-19)
21. Install the "Lower Bin Wall Plate" 25 to seal the
"U-Trough Tube" 7 and opening that was cut in the
grain bin wall. Attach with carriage bolts or screws. The
"Upper Bin Wall Plate" 26 overlaps the "Lower Bin
Wall Plate" 25 by 1/2" to allow for proper watershed.
(See Fig. # 3-20)
7
Fig. # 3-20 Install Bin Wall Plates
22. Caulk any cracks or openings and fill cavities in corruga-
tions with a good quality silicone or butyl based sealant.
(See Fig. # 3-21)
Fig. # 3-21 Caulk Around Bin Wall Plates
3-8
26
1/2"
25
Fill Cavities
In Corrugations

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents