Norwood The Grain Handler 8 Operator's Manual page 45

Table of Contents

Advertisement

10. If already installed, remove the "Power Sweep Engage-
ment Lever" 11 , and all of the "Lever Hardware" 12
securing it.
(See Fig. # 3-9)
12
Fig. # 3-9 Remove the "Power Sweep Engagement Lever"
If installing in an existing grain bin with a full aeration
floor, it may be necessary to remove about half of the
floor.
The aeration floor planks must run perpendicular to
U-Trough Tube.
Fig. # 3-10 Grain Bin With Half of the Aeration Floor Re-
moved / Installed
12
12
NOTE
NOTE
3 - INSTALLATION
11. Move the "U-Trough Tube" 7 inside the grain bin
"Center Hopper Sump" end first.
12. Insert the discharge end of the "U-Trough Tube" 7
through the hole you cut in the grain bin.
11
12
12
Fig. # 3-11 Insert "U-Trough Tube" Through the Hole
13. Measure and center the "Splined Gearbox Output
Shaft" 11 with the exact center of the grain bin.
Fig. # 3-12) (See Fig. # 3-13)
Fig. # 3-12 Center The Splined Gearbox Output Shaft With
3-5
11
the Center of the Grain Bin
(See Fig. # 3-11)
7
(See

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents