Norwood The Grain Handler 8 Operator's Manual page 59

Table of Contents

Advertisement

6. Connect the "Horizontal Powerhead Output Shaft" 44
to the input shaft of the "U-Trough Unloading Auger
Flighting" 42 with the (Qty. 2) "1/2-13 X 3 Bolts" 45 ,
& "1/2-13 Nuts" 46 .
45
46
Fig. # 3-42 Horizontal Powerhead Installation Step # 6
7. Next, push the "Horizontal Powerhead" 43 with the
connected "U-Trough Unloading Auger Flighting" 42
back into the "U-Trough" 2 . Rotate the powerhead
slightly left to right so that the end of the auger flighting
splines meshes with the gearbox spline.
43
Fig. # 3-43 Horizontal Powerhead Installation Step # 7
3 - INSTALLATION
46
42
45
(See Fig. # 3-43)
42
2
8. When properly set, the end of the "U-Trough Unloading
Auger Flighting" 42 should be approximately 1.00" from
the "Splined Gearbox Input Shaft" 55 .
42
Fig. # 3-44 Horizontal Powerhead Installation Step # 8
9. Secure the "Horizontal Powerhead" 43 to the
"U-Trough" 2 with the (Qty. 4) "1/2-13 X 1 Bolts" 3
, & "1/2-13 Nuts" 4 .
43
Fig. # 3-45 Horizontal Powerhead Installation Step # 9
10. Install the "Powerhead Guard Assembly" 47 with the
3-19
(See Fig. # 3-44)
55
(See Fig. # 3-45)
3
4
1.00"
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents