Power Sweep Carrier Wheel Installation - Norwood The Grain Handler 8 Operator's Manual

Table of Contents

Advertisement

3 - INSTALLATION
19. When the drive wheel flighting extension is in the correct
centered location, then tighten the (Qty. 4) "3/8"-16 x
1-3/4 Bolts" 6 & "3/8"-16 Jam Nuts" 5 to 31 ft-lbs.
Then tighten the (Qty. 2) "3/8"-16 x 1-3/4 Bolts" 9 &
"3/8"-16 Jam Nuts" 8 to 23 ft-lbs.
(See Fig. # 3-81)
9
8
5
6
5
6
Fig. # 3-81 Installing New Standard Drive Wheel Flighting
Extension (Step 8)

Power Sweep Carrier Wheel Installation

3-33