5. First pattern is traced onto the grain bin wall.
3-5)
Fig. # 3-5 First Pattern Traced Onto Grain Bin Wall
6. Now measure upward from the horizontal line at 2-5/8"
and place a mark.
7. Place the top of the "U-Trough Tube Rodent Cover" 1
at the 2-5/8" mark. Level the cover using a "6" Torpedo
Level" 6 and trace the remaining lines onto the outside
of the "Grain Bin Wall" 5 .
6
5
Fig. # 3-6 Trace 2nd Pattern Onto Grain Bin Wall
3 - INSTALLATION
(See Fig. #
(See Fig. # 3-6)
1
8. Second pattern is traced onto the grain bin wall.
# 3-7)
Fig. # 3-7 Second Pattern Traced Onto Grain Bin Wall
9. Cut the hole you traced for the "U-Trough Tube" 7 ,
"Flange" 8 , "U-Trough Control Pinion Cover" 9 ,
& "Control Pinions" 10 to pass through the grain bin
wall with minimal clearance.
Fig. # 3-8 Cut the hole you traced for the "U-Trough Tube"
3-4
(See Fig.