Norwood The Grain Handler 8 Operator's Manual page 76

Table of Contents

Advertisement

7. Remove P/N 10-4-01136, which is the Carrier Wheel
Mount Plate, from the Carrier Wheel package and locate
on the sweep auger backboard plate and truss as shown
in
.
(See Fig. # 3-87)
This Radius
Stops On
Truss
This Edge
Stops On
Backboard
Fig. # 3-87 Locating Carrier Wheel Mount Plate
8. Clamp the Carrier Wheel Mount Plate to the bracket sup-
port and punch the 3 holes with the 13/32" transfer punch.
If you do not have a transfer punch, mark the holes with
a pencil or felt tip marker.
Clamp
Here
Clamp
Here
Fig. # 3-88 Punch or Mark Holes For Drilling
9. Remove the clamps and the Carrier Wheel Mount Plate
and pre-drill the 3 holes with a 1/8" drill bit, then the 13/32"
drill bit.
3 - INSTALLATION
Truss
Backboard
(See Fig. # 3-88)
Punch or
Mark these
3 Holes
10. Assemble the Carrier Wheel Mount Plate 1 to the sup-
port bracket using the 3/8"-16 X 1" bolts 2 , 3/8"-16 X
1-1/4" 3 , 3/8"-16 Nylock Nut 4 , and a 3/8" Flat Washer
5 .
(See Fig. # 3-89)
Nylock Nut on the bolt with the 3/8" Flat Washer.
2
2
3
5
Fig. # 3-89 Assemble Carrier Wheel Plate
11. Pre-assemble (Qty. 2) of the Front Wheel Arms, using
Plate, Front Carrier Wheel Arm 1 , Plate, Carrier Wheel
2 , 3/8" X 1" X 5/16-18 Shoulder Bolt 3 , 3/8" Flat Washer
4 , and a 5/16-18 Nylock Nut 5 . Make sure that the
wheels can spin freely.
3
4
4
Fig. # 3-90 Pre-Assemble The Front Wheel Carrier Arm
3-36
Note: Do not tighten the 3/8"-16
1
4
4
4
(See Fig. # 3-90)
2
4
4
1
2
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

The grain handler 10

Table of Contents