260
Gateway and Gateway 4 Manual v1.2
Monitor Control Port I/O Status
24.12
Product
Gateway 4
Gateway
8/16
To monitor the status of DB25 CONTROL PORT I/O relay inputs and opto-isolated outputs:
1. Press the SETTINGS
2. Use the navigation buttons to select System > Control Port I/O and press the
3. Select Inputs and then press the
4. Select Outputs and then press the
press the
changed in this way.
Feature
Notification
Control
Port
Supports 8 control port inputs and 8 opto-isolated outputs via a
GPIOs
single DB25 CONTROL PORT I/O connectors
Control
Port
Supports 16 control port inputs and 16 opto-isolated outputs via
GPIOs
dual DB25 CONTROL PORT I/O connectors
button.
button to toggle the output state from Off to On. Note: Input states cannot be
button to view input status.
button to view output status. Select an output and
button.
© Tieline Research Pty. Ltd. 2021
Need help?
Do you have a question about the Tieline Gateway and is the answer not in the manual?
Questions and answers