This chapter describes how to set up and start the T3LCR Series LCR Meter.
10
1.800.561.8187
Incoming Inspection
Environmental Requirements
Cleaning
How to Remove the Handle
After you receive the instrument, perform the following
checks during unpacking according to the following
procedure:
Make sure that the packing box or shock-absorbing
material used to package the instrument has not been
damaged.
Check that all packaged items supplied with the meter
have been provided as specified:
LCR
Test Lead
Power Cord
D-sub
www.
UNPACKING AND PREPERATION
information@itm.com
.com