Figure 64: Install the grounding studs assembly
5. Align the notch of the plug with the latch of the receptacle and insert the cable.
6. Rotate the first green ring on the plug clockwise until it is totally tightened.
7. Push the second green ring toward the palletizing operator base. User may need to repeat
step 5 and 6 until the cable plug is firmly tightened to the palletizing operator base.
TM Palletizing Operator User's Manual
Product Version: 1.1 Document Version: 1.2
103
Need help?
Do you have a question about the TM Palletizing Operator and is the answer not in the manual?
Questions and answers