Techman Robot TM Palletizing Operator User Manual page 102

Hide thumbs Also See for TM Palletizing Operator:
Table of Contents

Advertisement

2. Prepare the seal washer and screw from the product package.
3. Remove the screw circled in red in the image below and prepare the seal washer and screw
shown in the last step to connect the Ground Wire.
4. Assemble the Ground Wire connection in this sequence: screw  Ground Wire O-ring  seal
washer. Then align the screw to the screw hole and tighten it.
TM Palletizing Operator User's Manual
Product Version: 1.1 Document Version: 1.2
102

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TM Palletizing Operator and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents