Power And Grounding; Power-Up Procedures - HP LCS60 Installation Manual

Network interface for ethernet r3.0
Table of Contents

Advertisement

comment
hardware type
connect-time
number of channels
connect time billing
Single or multiple
group
Endpoint
restore

Power and Grounding

Connect the AC power cord provided to a three-wire grounded 110 VAC recep-
tacle and the LCS60 rear panel power receptacle as shown in Figure 2-7.
Connect DC power as shown in Figure 2-7.

Power-Up Procedures

Follow the steps below for LCS60 power up only after reading this section.
1 . Connect the LCS60 to the power source. For the AC power unit, the outlet
should be on a dedicated circuit for the LCS60.
2 . Power up the system console. (Refer to the section Connecting the System
Console.) If the system console is connected to the LCS60 by means of a
data switch network, enter the appropriate console name (entered in
Screens 2-1 or 2-2) in response to the DESTINATION prompt.
3 . Power up the LCS60 by turning the on/off switch to on.
Issue 3
A description of the entry.
The fiber interface hardware for the LCS60 always con-
nects to the CPM-HS.
Specifies if billing information is to be logged.
Enter 512.
This is not used for the LCS60.
Enter single.
Enter the group from the previous operation.
This is not used for the LCS60.
The CPM-HS module must be restored to service before
it can be used.
Installing the LCS60
2-25

Advertisement

Table of Contents
loading

Table of Contents