6. OPERATION START AND STOP
After correct wiring and piping has been completed, turn the power switch in the converter ON, and
measuring operation will begin.
Note: 10 min. of warm-up time is necessary after power ON.
Caution of before starting
(1) Furnace operation should be started after an elapsed time of 10 minutes from the point of turning
"ON" the power supply of this unit
(2) When a detector is to be installed in a furnace already in operation, take care to blow out harmful
gas from the furnace and then install the fully warmed up detector quickly.
6.2.1.1 When a process (furnace etc.) is to be shutdown for a short time i.e. a week
or so
It is strongly recommended to keep the detector in operation to avoid possible deterioration of platinum
electrodes in the detector and detector break-down due to repetition of power ON-OFF in a moisture
absorption state.
In case of the detector with an ejector (option), shutdown the air source.
6.2.1.2 When a process (furnace etc.) is to be shutdown for a long time
Turn OFF the power switch of the instrument after gas in the furnace has been replaced completely by
ambient air.