Reloading Auxiliary Console Initialization; Initiating Frame Relay Backup Switchover/Switchback; Ping Example - Cabletron Systems FRM User Manual

Frame relay module for the smartswitch 9000
Hide thumbs Also See for FRM:
Table of Contents

Advertisement

Reloading Auxiliary Console Initialization

Initiating Frame Relay Backup Switchover/Switchback

On-line Operations
It should be noted that pinging an FRM interface will verify only connectivity to that
FRM. Using the example in Figure 18-4, if the operator at device A wants to ping
device B, s/he must ping device B's IP address.
To ping Node 1, the operator at device A must ping the IP address of interface 1. To
ping Node B, the operator must ping interface 3. To locate a connectivity problem
between A and B, the operator at device A should first ping interface 1. If a response
is received, the operator at A should then ping interface 3, then (if a response is
received) device B.
A
1
Figure 18-4 Ping Example
This operation reloads the terminal settings defined for an async terminal connected
to the COM1 port on the FRM.
Press
at the Operations Menu (or
[E]
is connected the COM1 port, the initialization data will be sent.
Frame Relay Backup
DLCIs (see Chapter 7) can be configured to automatically
become operational a set time after failure of a primary DLCI, and to switch back to
the primary a set time after the primary becomes operational again. These automatic
settings can be overridden via Frame Relay Backup Operations (
Menu).
From the Frame Relay Backup Operations Menu:
To switch from a primary to one of its backups, press
To switch from a backup to a primary, press
In either case, enter (as prompted) the requested information to identify the primary
and backup.
2
FRM
1
from the Main Menu). If an async terminal
[B], [E]
3
FRM
4
2
from the Main
[B], [J]
.
[A]
.
[B]
B
18-11

Advertisement

Table of Contents
loading

Table of Contents