Nortel Communication Server 1000S Installation And Configuration Manual page 278

Isdn primary rate interface
Hide thumbs Also See for Communication Server 1000S:
Table of Contents

Advertisement

Page 278 of 394
553-3001-201
Standard 2.00
1.5 Mb DTI implementation
4
Within about 30 seconds, the D-channel layer 3 should be established. To
confirm, enter the following command in LD 60 to request the current
status of the D-channel:
STAT DCH (N)
The system response is:
DCH N EST OPER
This means that the D-channel is established and operational.
Procedure 36
Implementing DTI
Use this procedure to implement the DTI software interface between systems
or between a system and a central office.
1
Add a DTI card. See "LD 17 — Adding a DTI card" on
2
Configure a DTI trunk route. See "LD 16 — Configuring a DTI trunk route"
on
page
280.
3
Configure the trunks. See "LD 14 — Configuring the trunks" on
4
Assign clock's reference source. See "LD 73 — Assigning a clock's
reference source" on
September 2004
End of Procedure
page
281.
page
279.
page
280.

Advertisement

Table of Contents
loading

Table of Contents