Commissioning Check List
For Dialog+ SW 9.xx
Manufacturer:
Check List
Note: Text in { } brackets is information for the execution of the check list!
1.
Visual Inspection
1.1
{Machine: clean/complete; no damages/moisture influences or loose assemblies; no moveable parts touching tubings or wires; casters are moveable;
type plate legible}
1.2
{Check tight seat and damages of mains supply (power supply cord, strain relief), potential equalisation cable, staff call/data lines (if present) and
connectors}
2.
Protective Earth Resistance According to EN 62353
2.1
Protective Earth Resistance:
{(Machine incl. power supply cord. Move the power supply cord during the check. Thus possible loose connections can be detected. Data lines and
potential equalisation cable must not be connected during the check of the of the protective earth resistance (see figure 1)}
{Measurement points:}
{Exterior: Potential equalisation bolt, rinsing bridge (dialyser inlet and outlet)}
{Interior:
Heater body (top), rear door (top left corner), frame (rear), housing cover (top left), front door (top left)}
{Monitor: Monitor (one of the screws in the front panel/housing}
3.
Install Machine
3.1
{Connect water inlet to the metal tubing connector and fasten with single ear clamp.
Connect dialysate outlet to plastic tubing connector and fasten with tubing clamp.}
3.2
{Connect central supply for concentrate (central supply option) and deaerate tubings}
3.3
{Assemble holder for disinfectant (if option present)}
3.4
{Assemble dialyser holder}
3.5
{Assemble filter holder. Insert DF filter (option)}
3.6
{Assemble DF filter/HDF filter (if option present)}
4.
Function Inspection
{ P a y a t t e n t i o n t o t h e f i l l i n g p r o c e d u r e o f t h e m a c h i n e t o p r e v e n t d r y r u n o f t h e h e a t e r ! }
4.1
Switch on machine, fill and rinse:
4.2
Automatic Blood Pressure Measurement ABPM
4.2.1
ABPM Option:
4.3
Customer Specific System Setting:
BA-TE-DE08C M.KAY
Dialog+ SW9xx_SM_Chapter 1-1_1-2010.doc/pdf <110301> yymmdd
1 . C o m m i s s i o n i n g
The commissioning (putting into service) shall be performed and documented before the machine
is handed over to the responsible organisation (user), according to the specified check list, with
reference to the service manual and instructions for use.
REF {Type/Typ}:.................................................
Year of Purchase: .......................
.........................................................................................................................................................................
Operating Hours: .................................... h
SW Version: ...........................................
B. Braun Avitum AG
34209 Melsungen, Germany
< 0.3 [Ω]
- {Switch machine in Test 1.10 Degassing and Heating menu and fill with water until
water flows out of the dialysate outlet. Then rinse in disinfection (approx. 5 minutes).}
- Measurement on a test person is plausible
- {Switch machine in TSM Service Program: Execute Treatment Support (calibrate PE offset for
altitudes > 1000 m}
SN {Serien-No./Nr.}: ................................................
Responsible Organisation (User): .....................................................
Inventory No.: ..................................................................
{note highest value}:
1 / 2 0 1 0
................................................ [Ω]
Option present
no
yes
B. Braun Avitum AG
1 - 4
OK