Commissioning; Requirements - Emerson PACSystems RSTi-EP User Manual

Remote i/o system
Hide thumbs Also See for PACSystems RSTi-EP:
Table of Contents

Advertisement

User Manual
GFK-2958J
WARNING
Explosion risk - Prior to starting work, make sure that there is not a potentially
explosive atmosphere.
During commissioning, the system may be manipulated to such an extent that can
result in risks to life and material damage.
Ensure that system components cannot start up unintentionally.
CAUTION
Conduct an insulation test before each commissioning (refer to the section, General
Contact Information).
The procedures applied during commissioning depend on which control unit is being used
on site. The descriptions in this chapter use commissioning with a PROFINET network
adapter and the PAC Machine Edition as an example.
8.1

Requirements

Before you start the commissioning work, the following requirements must be fulfilled.
If these requirements are fulfilled, the following LEDs light up:

Commissioning

Commissioning
The control unit must be in operation.
The RSTi-EP station must be completely assembled and wired up.
The control unit and RSTi-EP station must be connected via fieldbus, and a PC/laptop
must also be connected.
The power supply must be turned on.
On the bus network adapter
The PWR LED lights up green.
For the port to which the control unit is connected, the LINK LED lights up green
and the ACT LED lights up yellow.
On the modules, the Status LED lights up green.
Chapter 8