NTP 106 — Install an I-010G-B indoor ONT
Figure NTP 106-4: Power connector pin configuration for I-010G-B indoor ONTs
10
11
12
13
14
15
NTP 106-6
Figure
NTP 106-4
shows the power connector on an I-040G-B indoor ONT. The
power connector is exactly the same and in the same location on the I-010G-B
indoor ONT.
Figure NTP 106-5: Molex 8-pin connector
Pin 2
Pin 8
Pin 1
Pin 3
Pin 7
Power up the ONT unit by using the ON/OFF power switch.
If used, configure the SLID (DLP 122).
Verify the ONT LEDs, voltage status, and optical signal levels (DLP 120).
Activate and test the services (DLP 121).
If necessary, reset the ONT (DLP 119).
STOP. This procedure is complete.
March 2011
ONT Product Information Guide Edition 01
Alcatel-Lucent 7330/7302 ISAM FTTN R04.02.42a
20533
20179
3FE 54199 AAAA TCZZA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7302

Table of Contents