6 — ONT management using an ONT interface
4
5
6
Procedures using CLI interface
The following procedure provides the steps to reboot an ONT using the CLI
interface.
Procedure 6-26 To reboot an ONT
1
2
3
4
5
Procedures using HTTP interface for Package C ONT
The following procedure provides the steps to reboot an ONT using the HTTP
interface for Package C ONTs.
6-42
Click on one of the following buttons to reboot the ONT:
Force reset—to reboot the ONT immediately regardless of the download state
of the ONT
Graceful reset—to reboot after an ongoing software download is complete
The reset ONT dialog box opens, as shown in Figure 6-24.
Figure 6-24 Reset ONT dialog box
Click on the Reset button to reboot the ONT.
The status bar appears a message after the ONT is rebooted successfully.
STOP. This procedure is complete.
Choose option 8, More options, from the
appears.
Choose option 7, Reboot an ONT, from the secondary menu.
The current state of the download appears. For example:
Software Download: State = Complete
press enter key to continue...
where the download states are described in Table
Press ↵ to continue.
Choose option 11, Return to main menu, to return to main menu.
STOP. This procedure is complete.
March 2011
ONT Product Information Guide Edition 01
Main
menu. The
Secondary menu
6-9
Alcatel-Lucent 7330/7302 ISAM FTTN R04.02.42a
3FE 54199 AAAA TCZZA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7302

Table of Contents