Alcatel-Lucent 7330 Product Information Manual page 358

Intelligent services access manager
Hide thumbs Also See for 7330:
Table of Contents

Advertisement

NTP 100 — Install a B-0404-A
Power cable connector
AC power converter
12
13
NTP 100-6
Figure NTP 100-4: B-0404-A with power converter
ii
Connect the power supply to the ONT as shown in Figure
Figure NTP 100-5: B-0404-A power connection
LINE 1
LINE 2
LINE 3
LINE 4
iii
Go to step 13.
Connect the B-0404-A to a UPS.
i
Install the UPS (DLP 107).
ii
Plug the optional 8-pin Molex output power cord in to the power connector
(DLP 110).
Verify the ONT LEDs, voltage status, and optical signal levels (DLP 120).
March 2011
ONT Product Information Guide Edition 01
PON
1
2
3
4
1
2
3
4
PON
4
2
3
1
Alcatel-Lucent 7330/7302 ISAM FTTN R04.02.42a
ONT power
connector
20000
NTP
100-5.
UPS
Power
cable
20151
3FE 54199 AAAA TCZZA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7302

Table of Contents