PLC commissioning
5.3 Configuring the PLC
3. If you have connected a new device in the meantime, click the "Refresh" button to refresh
the list of accessible nodes.
4. Using "Display", transfer to the project tree the device that has been found in the "Online
accesses" folder.
The subfolder of the interface to which the selected device is connected is selected in the
project tree.
Note
Several identical devices
If several identical devices can be accessed from the PG, by clicking on the "Flash LED"
button you can then display which device corresponds to the entry in the list of accessible
nodes.
5.3.8
Load hardware configuration into the PLC
Introduction
The project must be saved and compiled before the system data is created for the PLC and the
complete configuration can be closed.
Requirement
● The hardware configuration is compiled.
● A communication connection exists between the PG/PC (TIA Portal) and the SINUMERIK
MCU.
58
MCU commissioning: NC, PLC, Drive
Commissioning Manual, 02/2020, A5E47437618B AB