6.3.3
Configuring network settings for the drive
Preconditions
● The TIA Portal has been started.
● A SINUMERIK MCU has been inserted.
● The drive and control are interconnected.
MCU commissioning: NC, PLC, Drive
Commissioning Manual, 02/2020, A5E47437618B AB
Commissioning NC-controlled drives
6.3 Commissioning drives via device master files
131