Commissioning
5.1
Commissioning guidelines
Overview
SINAMICS G115D distributed drive
Operating Instructions, 12/2020, FW V4.7 SP13, A5E48681219B-002
1. Define the requirements to be met by the drive
for your application.
Preparing for commissioning
(Page 101)
2. Restore the factory settings of the converter if
necessary.
Restoring the factory settings
(Page 117)
3. Check if the factory setting of the converter is
sufficient for your application.
Factory settings (Page 101)
4. Perform quick commissioning of the drive in
one of the following ways:
–
Quick commissioning with DIP
switches (Page 106)
–
Quick commissioning with a PC
(Startdrive) (Page 108)
Quick commissioning with the
–
SINAMICS G120 Smart Access (Page 115)
5. Check if additional converter functions are
required for the application.
Advanced commissioning (Page 121)
6. If necessary, adapt the drive.
Advanced commissioning (Page 121)
7. Save your settings and perform data backup.
–
Saving the settings in the converter
(RAM → EEPROM) (Page 116)
Data backup and series
–
commissioning (Page 305)
5
99