Dut Test Module For Si/Sic T0-247-3 And -4 Devices - Keysight PD1500A Installation And Use Manual

Si/sic test fixture and modules
Hide thumbs Also See for PD1500A:
Table of Contents

Advertisement

Double-Pulse Test System Si/SiC Test Fixture
Installation and Use Guide
3
DUT Test Module for Si/SiC
T0-247-3 and -4 Devices
In this Chapter:
General Module Information
Install Two Transistors on the TO-247-3 and -4 DUT
Modules
page 45
You must install two identical devices on the DUT Module. They
do not need to be matched devices.Insert DUT transistors
before installing the Module on the Test Fixture.
Device Heater and Thermocouple on Device
Testing Devices with TO-220 Packaging
Always use Anti-static procedures when handling and inserting
devices into the Test Module. See "Static-safe Handling
Procedures" on page 16.
Some TO-247 package devices may have switched Drain and
Source leads. Always verify with the device data sheet before
inserting a device into the Test Module.
page 44
page 45
page 49
Install
43

Advertisement

Table of Contents
loading

Table of Contents