Double-Pulse Test Preparation; Connect The Waveform Generator To The Double-Pulse Test Fixture - Keysight PD1500A Installation And Use Manual

Si/sic test fixture and modules
Hide thumbs Also See for PD1500A:
Table of Contents

Advertisement

Double-Pulse Test System Si/SiC Test Fixture
Installation and Use Guide
2

Double-Pulse Test Preparation

Before running the Double-Pulse Tests (DPT), the Test Fixture must be
connected to the test instruments and setup for the DPT test.

Connect the Waveform Generator to the Double-Pulse Test Fixture

Waveform Generator Channel 1 connects to the Low SMA Connector on the Test
Fixture. Waveform Generator Channel 2 connects to the High SMA Connector on
the Test Fixture.
Thermocouple Jack
(not used, for possible
future use only)
Hood Status LED:
Off
Open
- when
button
pressed
Red
- hood open
Green
- hood closed
and locked
Connect
Waveform
Generator cables
here.
Waveform
Generator
Channel 2 to
High-Side SMA
connector.
Waveform
Generator
Channel 1 to
Low-Side SMA
connector.
Figure 4
PD1000-68701Test Fixture
Device Heater light turns on when
Heater/DUT exceeds approximately 50
C.
Device/Heater
Thermocouple
Jack
Device Heater
Power Jack
Double-Pulse
Test Modules
Area
25