Double-Pulse Test Preparation

Install Test Modules on the Main Test Fixture

Figure 7 below shows the front half of the complete Test Fixture. Note the three
banana jacks for the DUT Module, the DIP headers for the High-Side and
Low-Side Gate Drive Modules, the DIP header for the Clamp Circuit Module, the
High and Low Waveform Generator SMA connectors, and the Deskew
Oscilloscope Probe Connectors.
Low-Side Gate Drive
Module DIP header
Waveform Generator SMA Connectors
High to Channel 2, Low to Channel 1
Figure 7
Front Half of Double-Pulse Test Fixture
28
High-Side Gate Drive
Module DIP header
Keysight Double-Pulse Test Fixture Installation and Use Guide
Install Test Modules on the Main Test Fixture
Clamp Circuit
Module DIP header
Oscilloscope Probe Connectors
used only for Deskew
DUT Module
Banana Jacks