B3: Several operator panels connected to several NCUs, distributed systems - only 840D sl
2.14 Supplementary conditions
2.14.3
Link axes
Availability
1. Precondition is that the NCUs are networked with link modules.
2. The link axis function is an option which is necessary for each link axis (max. 32).
3. The axis container function is an option which is necessary for each container.
References: /PHD/ 840D NCU Configuration Manual
In the context of Safety Integrated (SI) the boundary conditions must be observed, see brief
description, Chapter NCU-Link.
2.14.4
Axis container
Availability
Axis container is an option. In cases where axis containers are configured for link axes, the
supplementary conditions for these containers defined in Section "Link axes" also apply.
In the context of Safety Integrated (SI) the boundary conditions must be observed, see brief
description, Chapter NCU-Link.
2.14.5
Lead link axis
Availability
Cross-NCU coupling with lead link axis is based on an NCU link. Therefore, the NCU link
options must be installed.
In the context of Safety Integrated (SI) the boundary conditions must be observed, see brief
description, Chapter NCU-Link.
198
WARNING
WARNING
WARNING
Function Manual, 09/2009, 6FC5397-1BP20-0BA0
Extended Functions