Fujitsu Airstage J-II Series Design & Technical Manual page 931

Small vrf system
Table of Contents

Advertisement

4-3. INSTALLATION
● Control box which is a part of RB units can be also changed the position depending on installation condition at
each side of RB units
● Be sure to prepare Service access in control box side.
● Since the sound of refrigerant flow may be felt as an unusual sound, do not install in the underpart of the roof,
such as a bedroom which sound worries.
„ MODELS: UTP-RU01AH, UTP-RU01BH, UTP-RU01CH
z Ceiling installation
20 (500) or more
z Wall installation
E.g.: If installing a duct model vertically.
Service
space
Grille
1 (20) or more
1 (20) or more
20 (500) or more
1 (20) or more
Control box
4 (100) or more
Service access
16 (400)
12 (300)
or more
1 (20)
or more
- (10 - 36) -
Unit: in. (mm)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airstage aou36rlavmAirstage aou48rlavmAirstage aou60rlavmAirstage auua4tlav1Airstage auua7tlavAirstage auua9tlav ... Show all

Table of Contents