Fujitsu Airstage J-II Series Design & Technical Manual page 816

Small vrf system
Table of Contents

Advertisement

„ ELECTRICITY METER SYSTEM
Electricity meter system is the connection configuration of one electricity meter and the air
conditioner units which are connected to the power line under it. This is set on the System
Controller.
Set the System Controller to match the actual electricity meter installation configuration.
Since the electricity charge apportionment function/energy saving function perform control
using the Input Power data from an electricity meter, it is necessary to set an electricity meter
system on the System Controller.
When installing electricity meters as shown below, 5 electricity meters systems are set.
Electricity meter system 1
Whm
Whm
Whm
Electricity meter
Electricity meter system 2
Whm
Whm
Electricity meter system 4
- (07 - 169) -
Electricity meter system 3
Whm
Electricity meter system 5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airstage aou36rlavmAirstage aou48rlavmAirstage aou60rlavmAirstage auua4tlav1Airstage auua7tlavAirstage auua9tlav ... Show all

Table of Contents