z Heat insulation installation
After brazing the pipes, and leak check use the supplied insulation to insulate them.
1) Remove the protective sheet from the double-stick tape that is affixed to the heat insulation.
Double-stick tapes
2) Be sure to install the tape (accessory) in each heat insulation to the 2 positions as shown in
the following figure.
Tapes (accessory)
3) Use tape (Locally purchased) to seal the seam so that there will be no gap at the junction
between the aforementioned heat insulation and the heat insulation on the local piping.
Insulations (Locally
purchased)
● Insulate the liquid and gas pipe completely. If not, it may cause the water condensation or performance reduction.
● Wrap the heat insulation with tape or pipe cover in order to extend the life time of heat insulation.
● Take proper measurement to strengthen by using another heat insulation at the following installing environment.
(a) Environment temperature ≥ 95°F (35°C) and humidity 85%.
(b) Environment temperature ≥ 77°F (25°C) and humidity 90%.
Heat insulation
(Locally
purchased)
Contact each other
CAUTION
Installation example
- (06 - 33) -
Tapes (Locally purchased)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airstage aou36rlavmAirstage aou48rlavmAirstage aou60rlavmAirstage auua4tlav1Airstage auua7tlavAirstage auua9tlav ... Show all

Table of Contents