Removing And Installing Drive Chain For Valve Gear - Audi Q7 2007 Workshop Manual

6-cylinder tdi engine (3.0 ltr. 4-valve common rail), mechanics
Hide thumbs Also See for Q7 2007:
Table of Contents

Advertisement

更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
2.10 Removing and installing drive chain for
valve gear
Special tools and workshop equipment required
Drill bit, ∅ 3.3 mm
Removing
Remove timing chain covers
Remove camshaft timing chains
Remove chain for oil pump and balance shaft
Press guide rail of chain tensioner for drive chain in direc-
tion of -arrow- and lock chain tensioner by inserting a
3.3 mm ∅ drill bit -item 4-.
Mark running direction of chain with paint.
Remove bolts -2- and -3- and detach chain sprockets to-
gether with drive chain and guide rail -1-.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
Crankshaft -1- locked in "TDC" position with locking pin
-3242-.
First install sprocket for camshaft timing chain (left-side)
-2-.
Install guide rail -1- with drive chain fitted.
Now install sprocket for camshaft timing chain (right-side)
-3-.
Push guide rail of chain tensioner for drive chain in direc-
tion of -arrow- and pull drill bit -4- out of chain tensioner.
Install chain for oil pump and balance shaft
Install camshaft timing chains
Install timing chain covers
Tightening torques
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
⇒ page
59.
⇒ page
65.
⇒ page
65.
⇒ page
60.
⇒ page
85.
⇒ page 85
2 Servicing work on timing chain end
Audi Q7 2007 !
6
83

Advertisement

Table of Contents
loading

Table of Contents