Audi Q7 2007 Workshop Manual page 181

6-cylinder tdi engine (3.0 ltr. 4-valve common rail), mechanics
Hide thumbs Also See for Q7 2007:
Table of Contents

Advertisement

更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
Place drip tray for workshop hoist -VAS 6208- under en-
gine.
Disconnect coolant hose -arrow- from coolant pipe (left-
side) and drain off coolant.
Unscrew bolts -1 ... 5- and remove bracket for ancillaries.
Unscrew bolt -arrow- and remove coolant pipe (left-side)
from bracket for ancillaries.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
Note
Renew seal and O-ring.
Secure all hose connections with the correct type of hose
clips (same as original equipment) ⇒ Parts catalogue.
Before installing, clean and smoothen sealing surface for
seal and O-ring.
Lubricate new seal and new O-ring with "G12+" and slide
onto coolant pipe.
Install air conditioner compressor ⇒ Rep. Gr. 87.
Install power steering pump ⇒ Rep. Gr. 48.
Fill cooling system
Tightening torques
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
⇒ page
162.
1 Removing and installing parts of cooling system
Audi Q7 2007 !
6
175

Advertisement

Table of Contents
loading

Table of Contents