更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
–
Apply adapter -T40061- to the heads of the loosened
bolts.
–
Turn camshaft slightly backwards and forwards with
adapter -T40061- until locking pin -T40060- can be insert-
ed.
•
The side pin -arrow- on the locking pin -T40060- must be
in line with the imaginary line between the locking pin and
the centre of the camshaft.
–
With adapter -T40061- and locking pin -T40060- still in po-
sition, tighten bolts on sprocket to approx: 5 Nm.
–
Remove locking pin -T40060- and adapter -T40061-.
–
Tighten bolts on sprocket to final torque.
–
Repeat this procedure on the other cylinder bank if neces-
sary.
–
Remove locking pin -3242-.
–
Check valve timing once again
Remaining installation steps are carried out in reverse se-
quence; note the following:
–
Screw plug -arrow- for "TDC" mark into top section of
sump with a new seal.
–
Install timing chain covers
–
Install coolant pipe (rear right)
–
Install exhauster pump
–
Install starter catalytic converter
–
Fill cooling system
Tightening torques
Component
Chain tensioner to cylinder head
Camshaft sprocket to camshaft
Screw plug in top section of sump
•
1)
Renew bolts.
•
2)
90° = one quarter turn.
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
⇒ page
79.
⇒ page
60.
⇒ page
181.
⇒ page
52.
⇒ page
⇒ page
162.
204.
Nm
5 + 90°
1)2)
24
35
2 Servicing work on timing chain end
Audi Q7 2007 !
6
81