Audi Q7 2007 Workshop Manual page 116

6-cylinder tdi engine (3.0 ltr. 4-valve common rail), mechanics
Hide thumbs Also See for Q7 2007:
Table of Contents

Advertisement

Audi Q7 2007 !
6
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
Pull covers upwards and turn them
Unbolt injectors -arrows-.
Pull out injector units using puller -T10055- with adapter
-T10055/1-.
Caution!
Mark cylinder numbers on injector units.
Used injectors must always be re-installed on the same
cylinder.
Loosen cylinder head cover bolts -arrows- in diagonal se-
quence.
Remove bolts and take off cylinder head cover.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
Note
Renew cylinder head cover gaskets if damaged.
Renew gaskets, seals and O-rings.
Hose connections and hoses for charge air system must be
free of oil and grease before assembly.
Secure all hose connections with the correct type of hose
clips (same as original equipment) ⇒ Parts catalogue.
Tighten cylinder head cover bolts diagonally and in stages.
Instructions for installing injectors:
Before installation, make sure the injectors and their sur-
roundings are clean. If necessary use a clean cloth to wipe
out the injector slot, taking care not to cause damage (do
not use sharp-edged tools).
Always install new seals and gaskets. Lubricate all seals
and gaskets lightly with engine oil or assembly oil before
installing.
110
Repair Group 15 – Cylinder head, valve gear
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
1
/
turn (90°).
4

Advertisement

Table of Contents
loading

Table of Contents