Audi Q7 2007 !
6
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
10 – Removing and installing engine
1
Removing and installing engine
Note
The engine is removed from underneath together with the
♦
gearbox and subframe (with lock carrier installed).
All cable ties which are released or cut open when remov-
♦
ing must be fitted in the same position when installing.
Collect drained coolant in a clean container for re-use or
♦
disposal.
1.1
Removing engine
Special tools and workshop
equipment required
Spring tensioner
♦
-VW 552-
Removal lever -80-200-
♦
Hose clamps for hoses
♦
up to 25 mm Ø -3094-
Used oil collection and
♦
extraction unit
-V.A.G 1782-
Hose clip pliers
♦
-V.A.G 1921-
Stepladder -VAS 5085-
♦
4
Repair Group 10 – Removing and installing engine
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259