Removing And Installing Engine; Removing Engine - Audi Q7 2007 Workshop Manual

6-cylinder tdi engine (3.0 ltr. 4-valve common rail), mechanics
Hide thumbs Also See for Q7 2007:
Table of Contents

Advertisement

Audi Q7 2007 !
6
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
10 – Removing and installing engine
1

Removing and installing engine

Note
The engine is removed from underneath together with the
gearbox and subframe (with lock carrier installed).
All cable ties which are released or cut open when remov-
ing must be fitted in the same position when installing.
Collect drained coolant in a clean container for re-use or
disposal.
1.1

Removing engine

Special tools and workshop
equipment required
Spring tensioner
-VW 552-
Removal lever -80-200-
Hose clamps for hoses
up to 25 mm Ø -3094-
Used oil collection and
extraction unit
-V.A.G 1782-
Hose clip pliers
-V.A.G 1921-
Stepladder -VAS 5085-
4
Repair Group 10 – Removing and installing engine
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259

Advertisement

Table of Contents
loading

Table of Contents