Audi Q7 2007 !
6
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
–
Position the support elements from -VAS 6131/10- at left
and right of gearbox carrier, as shown in the illustration.
–
Turn spindles for the support elements upwards until all lo-
cating lugs make contact with the mounting points.
–
Tighten base plates for support elements to 20 Nm on scis-
sor-type assembly platform -VAS 6131-.
–
Disengage both spring tensioners -VW 552- from drillings
in wheel housing.
–
Mark the installation position of the subframe, the engine
cross member and the gearbox carrier on longitudinal
members with felt-tip pen.
–
Unscrew bolts -1 ... 4- in diagonal sequence and in stages.
Note
Check that all hoses and other connections between en-
♦
gine/gearbox assembly and body have been detached.
Carefully guide out engine/gearbox assembly from engine
♦
compartment when lowering to avoid damage.
Carefully guide suspension struts past longitudinal mem-
♦
bers.
–
Lower the engine/gearbox assembly using scissor-type as-
sembly platform -VAS 6131- initially only as far as dis-
tance -a-.
•
Dimension -a- = 200 mm.
20
Repair Group 10 – Removing and installing engine
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259