Removing And Installing Charge Air Pressure Sender -G31 - Audi Q7 2007 Workshop Manual

6-cylinder tdi engine (3.0 ltr. 4-valve common rail), mechanics
Hide thumbs Also See for Q7 2007:
Table of Contents

Advertisement

Audi Q7 2007 !
6
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
Unclip air duct -1- from charge air cooler.
Remove bolts and nut -1 ... 3- and take out charge air cool-
er.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
Note
Hose connections and hoses for charge air system must be
free of oil and grease before assembly.
Secure all hose connections with the correct type of hose
clips (same as original equipment) ⇒ Parts catalogue.
Install bumper cover (front) ⇒ Rep. Gr. 63.
Tightening torques
Component
Hose clips
1.7
Removing and installing charge air pres-
sure sender -G31-
Removing
Unplug electrical connector -arrow- at charge air pressure
sender -G31-.
Remove bolts and pull charge air pressure sender -G31- out
of connection.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
Note
Renew O-ring.
Tightening torque
200
Repair Group 21 – Turbocharging/supercharging
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
Width 9 mm
Width 13
mm
Nm
3
5.5

Advertisement

Table of Contents
loading

Table of Contents