Audi Q7 2007 Workshop Manual page 117

6-cylinder tdi engine (3.0 ltr. 4-valve common rail), mechanics
Hide thumbs Also See for Q7 2007:
Table of Contents

Advertisement

更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
The injectors must be completely undamaged. To remove
the old copper seal from the injector, clamp the seal care-
fully in a vice so that it is just held between the jaws with-
out turning. Then carefully pull and twist the injector out
of the copper seal by hand.
When an injector is renewed, also renew the injector pipe
and clamping piece at the same time.
Used injectors and injector pipes may only be re-installed
on the same cylinder.
Install injectors.
Tighten union nuts on high-pressure pipes hand-tight ini-
tially.
Ensure that high-pressure pipes are not under tension.
To tighten unions of high-pressure pipes at rail elements,
use torque wrench -V.A.G 1331- with tool insert, AF 19
-V.A.G 1331/5-.
To tighten unions of high-pressure pipe at high-pressure
pump, use torque wrench -V.A.G 1331- with ratchet
-V.A.G 1331/1- and socket, 17 mm -T40055-.
Check fuel system for leaks
Tightening torques
Component
Cylinder head cover to cylinder head
Injector in cylinder head
Cover for injector to cylinder head
High-pressure pipes
Bracket for wiring harness to cylinder head
Bracket for intake connecting pipe to cylin-
der head
Throttle valve
intake manifold
module -J338-
bracket
with intake
connecting pipe for me-
connecting
chanical exhaust gas recir-
pipe to:
culation valve
Hose clips (13 mm wide)
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
⇒ page
3.
Nm
9
9
5
25
9
9
9
9
9
5.5
1 Removing and installing cylinder head
Audi Q7 2007 !
6
111

Advertisement

Table of Contents
loading

Table of Contents