更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
–
Loosen central bolt -1- for toothed belt drive sprocket ap-
prox. 2 turns using counterhold tool -3036-.
–
Use puller -T10320- to pull off toothed belt drive sprocket.
–
Take off toothed belt drive sprocket together with toothed
belt.
–
Remove bolts -arrows- and detach toothed belt cover
(rear).
Cylinder head (right-side):
–
Disconnect fuel supply line -2- and fuel return line -1- from
high-pressure pump and move lines clear to the side.
Continuation for both sides:
–
Remove intake manifold (top section) ⇒ Rep. Gr. 23.
–
Remove bottom section of intake manifold (left or right)
⇒ Rep. Gr. 23.
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
1 Removing and installing cylinder head
Audi Q7 2007 !
6
113